Stoke Park School

Stoke Park Secondary School in Coventry is expanding to accommodate a growing number of pupils through a new dedicated Year 7 provision called ‘The Bridge’.

The project features a purpose-built teaching block linked to a refurbished Youth Centre. Together, these buildings will provide a full suite of Year 7 classrooms and support spaces, along with a new drama classroom to replace an existing prefabricated unit.

Rooflight cannons provide high level natural light into the heart of the building and to north facing classrooms. Generous corridor widths, vision panels and acoustic ceilings promote a high quality student experience.

The landscape design enhances the wider campus with improved parking, new trees and planting, and carefully planned outdoor spaces for 210 Year 7 pupils. The external areas include a new multi-use games area (MUGA) and a mix of hard-surfaced spaces designed for play, recreation, and social interaction, while retaining walls and planting create a sense of shelter, structure, and enclosure across the site.

  • Client:Coventry City Council
  • Type:New build & Retrofit
  • Location:Barras Heath, Coventry
  • GIA:1008 m²
  • Status:Planning achieved, main works due on site 2026
  • Consultants:Currie & Brown (Project Managers), Form Structures (Structural Engineers), Norman Bromley Partnership (M&E), ME Landscape (Landscape Architect), Anderson Acoustics (Acoustic Consultants), Trigon (Fire Consultants)