The new link bridge which will connect the north and south blocks of Tollgate Primary School and unite Key Stage 1 and 2 accommodation as part of the school expansion scheme was installed today. It is a pre-fabricated steel structure which was craned into place in one piece. The link bridge will provide a sheltered route between the two buildings, access to a new roof-top play deck and will be clad with bronze vertical louvres.
For more information on the project click here